Badera substation at final stage, 15,000 trees to be felled for Sunwal-Bardaghat transmission line
By The Rising Nepal
11 Apr, 2021
Ashok Pokhrel, information officer of the new Butwal-Bardaghat 220 kv transmission line and sub-station project, informed that construction work of the substation of the 220kv transmision line at Badera, near Sunwal, in West Nawalparasi has entered the final stage and that a large number of trees needed to be cut down to expand the transmission line from Badera to Bardaghat, which is the second stage of the project.