Baglung, Feb 3: Minister for Energy, Water Resources and Irrigation Barsha Man Pun today pledged to advance the Uttarganga reservoir-based hydropower project after addressing the demands of the affected local people.
He also sought help of the local people in pushing forward the project.
"Local people play a significant role in moving forward the project as it will benefit not only the local people but the whole country," he said while inspecting the project at Dhorpatan in the district.
Nepal Electricity Authority is carrying out a study on the 828 megawatts project. Likewise, Debendra Poudel, lawmaker from Baglung and member of the standing committee of Nepal Communist Party, urged the government to forward the project as soon as possible. "This project means to change the face of the whole country, but not only Baglung. We are ready to be cooperative for the same," he said.
The Uttarganga hydropower company, a NEA's auxiliary company, has initiated a process to select consultants to prepare a detailed project report of the project.
According to a preliminary study, at least 625 families will be displaced by the project. The project is expected to cost Rs 70 billion and the deadline is by 2083 BS.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022