Damauli, March 14 : Construction of a Reinforced Concrete Cement (RCC) bridge over the Phedi rivulet linking two municipalities of Tanahun district has been completed.
The bridge has been constructed over the rivulet connecting Bhimad municipality and Rishing rural municipality of the district. As shared, the bridge construction had started on January 2021.
Locals have been elated with the construction of the bridge in a place where it was difficult to cross the rivulet during the rainy season.
The bridge having a length of 25 meters and a breadth of 8.4 meters has been constructed at the investment of over Rs 35.83 million. Gandaki Province Ministry of Physical Infrastructure had invested for the bridge construction.
Over a thousand of people from Bhimad and Rishing have been benefitted after the construction of a RCC bridge over the rivulet.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022