Birgunj, Jan 10 : After the success of the Motihari-Amlekhgunj petroleum pipeline project, the government is extending the pipeline from Amlekhgunj to Lothar of Chitwan.
A study is now underway to materialize the 69-kilometers pipeline from Amlekhgunj to Chitwan, said Nepal coordinator in the Nepal-India Pipeline Joint Study Group, Birendra Goit.
The study will help to identify the method of extending the pipeline and the estimated cost.
A joint task force to be formed following an understanding between the governments of Nepal and India will develop the detail project report.
Lothar in Chitwan will have a storage capacity of 100,000 kilolitre of petroleum.
The pipeline from Motihari of India to Amlekhgunj depot of Nepal Oil Corporation is being used to transport diesel and a study is now being carried to start transportation of petrol as well, using the same pipeline, said Chief of NOC Province-2, Bharat Regmi. For this two petrol tanks of 4.2 million litre capacity each are being constructed at the Amlekhgunj depot for storing petrol.
Petrol can be supplied at the rate of 300,000 to 400,000 litres per hour using the pipeline.
Transportation of fuel using the pipeline has saved transportation cost, ended technical loss and helps maintain quality and control leakage, Regmi said.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022