Kathmandu, Jan 30: The SJVN Limited of India has been selected to prepare the project framework for the Lower Arun Hyrdropower Project.
The framework for the project will be developed as Build, Own, Operate and Transfer (BOOT) model under the public-private partnership framework. A decision to this end was taken by a meeting on Friday of the Investment Board of Nepal chaired by Prime Minister KP Sharma Oli.
The selection was made based on an assessment of the companies listed through international bidding. The 679 MW-project will be based in Sankhuwasabha and Bhojpur districts. The project was proposed before international investors during the Nepal Investment Summit held in Kathmandu 2019.
At the meeting, Prime Minister and Chair of the Board Oli said that a plan should also be developed to increase power consumption along with production, for which the infrastructure projects needs to be implemented on time, according to IBN spokesperson Dharmendra Kumar Mishra.
Meanwhile, the meeting decided to invite as experts to the Board Rajesh Kaji Shrestha, Hari Bhakta Sharma and Bhawani Rana, and Balkrishna Shiwakoti as invitee member.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022