Sindhupalchowk, Aug 10 : The massive flood occurred on June 16 damaged roads, and suspension and motorable bridges in the western belt of Sindhupalchowk.
The collapse of bridges in different locations severed road connection to Helambu, Panchpokhari Thangpal, various villages of Melamchi Municipality and Indrawati Rural Municipality.
With the detachment for long, the local levels have initiated to restore the alternative land routes. Now, the roadway to reach Gyalthum of Helambu from Kathmandu has been ready. It links Sankhu of Kathmandu via Bhotechaur, Haibung and Patibhanjyang, said a people's representative, Nima Gyaljen Sherpa.
Similarly, efforts are underway to manage an alternative roadway for the buses to operate along the Narayantar, Bhotechaur, Dhuseni, Manebhanjyang, Chapbot, Talamarang and Dhungrebazar.
Transport entrepreneur Suresh Shrestha informed that a bus was being left from Kathmandu for Sindhupalchowk at 6:00, 9:00am and 12:00 noon. The bus service could be increased in view of the condition of the above mentioned road.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022