Makawanpur, Oct. 8: The Kulekhani Hydro Power Project (hydel) I at Makwanpur district has decided to give continuity to the generation of 106 megawatt of electricity that was being produced on a daily basis.
The Hydel Project Office Chief Dhirendra Chaudhary shared that move was made after the instruction of the Nepal Electricity Authority (NEA) which aims to ensure smooth supply of the electricity during the upcoming festival time.
During the festival time, the consumption of electricity is higher. With the continuation of electricity production, the NEA could produce power in full capacity so as to ensure regular supply of the electricity which could get interrupted due to bad weather at any moment.
The Hydel has three power production houses. The first one generates 60 megawatt of electricity, second 32 and third one 14.
The Hydel is situated at Indrasarobar Reservoir at Indrasarobar Rural Municipality in Makawanpur district.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022