By A Staff Reporter
Kathmandu, Aug. 29: The Ranipokhari Reconstruction Users’ Committee (RRUC) said on Friday that the reconstruction of the historic pond was at the final stage.
Briefing the Minister of State of the Ministry of Urban Development Rambir Manandhar and Mayor of the Kathmandu Metropolitan City Bidya Sundar Shakya, chairperson of the RRUC Ajay Sthapit said that about 85 per cent reconstruction work on the pond had completed.
“The pond construction has been completed while temple rebuilding and beautification work have achieved 85 per cent progress. We are continuing the work even during the lockdown and aim to complete it at the earliest,” he said.
The minister and the mayor on Friday made a field inspection of the reconstruction of the historic pond, constructed by Pratap Malla four centuries ago, at the centre of the Capital.
The RRUC is preparing to inaugurate the heritage immediately after the coronavirus pandemic is contained.
Sthapit thanked the metropolis for its support in forming the RRUC and other necessary supports during the rebuilding process. A committee represented by chairmen of KMC ward no. 1, 27 and 28 is monitoring the reconstruction works.
Minister of State Manandhar said that the completion of the pond would be a moment of pride since it was not only the historical heritage but also the monument of culture and symbol of love.
“It gives me immense pleasure to see the work nearing the completion of the restoration of the heritage. This pond is an example of love to the world,” he said.
Mayor Shakya expressed that the restoration work had moved ahead without any dispute after the formation of the RRUC.
The restoration work was started about one and a half years ago. Although it should have been completed within eight months from the commencement of the work, attention to the details like the arts and black mud created obstacles to the smooth progress.
Secretary of the RRUC Roshan Tuladhar said that the efforts were made to maintain the originality of the Kathmandu city at the Ranipokhari. The pond is restored at the cost of Rs. 95.4 million while Rs. 150 million has been allotted for Balgopaleshwor Temple reconstruction and beautification work.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022