Sindhupalchowk, Aug 21: The Kodari Highway under the Araniko Highway which had collapsed nearby the Tatopani checkpoint in Sindhupalchowk district following a massive flood in June 15 has been partially opened after maintenance.
Efforts were being made to resume traffic movement in the Highway that connects with bordering China. Now that the Highway has come into operation partially, preparation is afoot to resume vehicular movement in the Highway in full-fledge in some weeks, said Bijay Mahato, an engineer at the Road Division Office, Dolakha.
The flood-damaged Liping Bridge has also come into operation after support was given to all pillars of the bridge. Flood, landslide and soil erosion among other monsoon-induced disasters had caused many road sections under the Highway cave in.
Opening one of the important checkpoints with China and operating the Highway was imperative in view of nearing festivals, viewed engineer Mahato.
There have been no exports recorded from Nepal to China through the Tatopani Checkpoint while imports have been recorded but not in bulk as in the past.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022