Lamjung, Sept 19 : The floods and landslides triggered by incessant rain since Friday evening have obstructed traffic along the Beshishahar-Chame road section this morning.
Road traffic has been halted with the landslide occurred at Kharkharebhir along the Beshisahar-Chame road section connecting Lamjung and Manang districts.
Sub-Engineer of the Dumre-Beshishahar-Chamre road project office Lamjung, Suman Adhikari said the landslide with boulders rolling down from above 300 metres off the road have disrupted the traffic at Beshishahar municipality-6.
“There is no possibility to immediately resume the traffic operation. The road obstructed is quite narrow, the land is also filthy and the Marsyangdi River has eroded the portion below the road and the landslide is continuous”, he added.
All the vehicles carrying goods and passengers as well as emergency services have been stranded on the road due to road disruption.
Earlier too, the floods and landslides occurred along with the heavy rainfall had crumbled 20 metres section of the road on Wednesday morning.
Do not make expressions casting dout on election: EC
14 Apr, 2022CM Bhatta says may New Year 2079 BS inspire positive thinking
14 Apr, 2022Three new cases, 44 recoveries in 24 hours
14 Apr, 2022689 climbers of 84 teams so far acquire permits for climbing various peaks this spring season
14 Apr, 2022How the rising cost of living crisis is impacting Nepal
14 Apr, 2022US military confirms an interstellar meteor collided with Earth
14 Apr, 2022Valneva Covid vaccine approved for use in UK
14 Apr, 2022Chair Prachanda highlights need of unity among Maoist, Communist forces
14 Apr, 2022Ranbir Kapoor and Alia Bhatt: Bollywood toasts star couple on wedding
14 Apr, 2022President Bhandari confers decorations (Photo Feature)
14 Apr, 2022